Street Maintenance/Construction Supervisor


Job Details

Salary : $53,768.00 - $68,556.80 Annually

Location : Orlando, FL

Job Type: Full Time

Job Number: 24-247

Department: Public Works

Division: Wastewater Enterprises

Opening Date: 04/13/2024

Closing Date: Continuous

Description

Who We Are

Orlando, The City Beautiful

For most of Orlando's history we've been the place everyone wants to visit. Today, we're also the place where everyone wants to live and do business. List after list has Orlando as one of the fastest growing cities in America. We're transitioning from our role as the young upstart to a more mature, global city.

This didn't happen by accident. Together as a community, we developed a shared vision for our city focused on creating partnerships and we've transformed Orlando from a place that was packed with potential into a city on the rise.

Our vision ensures we are an inclusive, compassionate community that is generating jobs, becoming the most sustainable city in the nation, keeping our community safe, making it easier to get around, and increasing the quality of life. Together, we can continue realizing all our city's potential.

Come be part of our community with the City of Orlando.

Nature of Work:
(Water Reclamation)
Performs supervisory and administrative work over crews responsible for the opening of various streets, driveways and sidewalks to facilitate the installation, maintenance and repair of the wastewater collection system and ensures restoration in accordance with local regulatory agency standards. This position assists in hiring and evaluating personnel; provides direction to enhance work performance of subordinates; responds to any emergency repair on the wastewater collection system/reclaimed water distribution system needed during designated duty weeks and makes decisions on how to conduct the repair based on the severity and difficulty. Additionally, this position informs public and affected utilities of pending disruption of service; protects the integrity of the wastewater collection system/reclaimed water distribution system by ensuring high quality workmanship during all phases of construction, maintenance and repair. Work is performed under the supervision of a Systems Evaluation and Maintenance Supervisor and is reviewed by direct observation and through discussions while in progress and upon completion.

Minimum Requirements

(Water Reclamation)
High School graduate plus four (4) years' experience in the testing, inspection, and repair of manholes and sewer lines, two (2) of which must have been in a supervisory capacity; or an equivalent combination of education, training, and experience. FDOT Advanced Temporary Traffic Control (TTC) or Maintenance of Traffic (MOT) Certification required.A valid Florida CDL Class B required. Florida Class B Water and Pollution Control Collection Technician License required within time limit set by department. A GOAA Secure Area Access I. D. badge is required within ninety (90) days of hire.
Supplemental Information

If this posting indicates a degree is required, the following experience will apply in lieu of any degree as follows:

  • Two (2) years of direct experience for an associate degree;
  • Four (4) years of direct experience for a bachelor's degree;
  • Six (6) years of direct experience for a master's degree; or
  • Nine (9) years of direct experience for a doctoral degree


01

A valid commercial driver license from any state is required for this position. If you possess a Florida CDL, enter the DL number (no dashes or spaces) and expiration date in the space provided. Please follow the format shown:Example: X123#######30 Exp 01/01/2022If you possess a valid CDL equivalent to a Class B or A from another state or country, enter OTHER STATE. If you possess only a regular driver license at this time, enter OPERATORS in the space.If you do not possess a valid driver license at this time, enter NONE.

02

Do you possess a valid Florida CDL Class B license or higher?
  • Yes
  • No


03

What is the highest level of education you have attained?
  • Less than high school
  • High school graduate or equivalent (GED)
  • Technical school completed
  • Some college (less than 60 semester credits)
  • Associate degree or equivalent (60 or more semester credits)
  • Bachelor degree (120 or more semester credits)
  • Master degree
  • Doctorate degree


04

How much full-time work experience do you have in in roadway, concrete, and asphalt construction and repair?
You must provide details in your online application or resume.
  • None
  • Some but less than two years
  • Between two and four years
  • Between four and six years
  • Between six and eight years
  • Between eight and ten years
  • More than ten years


05

Of your experience described, above, how much was in a lead or supervisory capacity?
You must provide details in your online application or resume.
  • None
  • Some but less than two years
  • Between two and four years
  • Between four and six years
  • More than six years


06

Do you have at least four years' experience in the testing, inspecting and repairing sewer lines and manholes? You must include complete details in your online application or resume.
  • Yes
  • No


07

Do you posses a FDOT Advanced Temporary Traffic Control (TTC) or Maintenance of Traffic (MOT). You must include complete copies of certification in your online application or resume.

Required Question





 City of Orlando (FL)

 06/01/2024

 Orlando,FL